HidroingHidroing
HidroingHidroing
WATER & WASTEWATER

Technical and financial assessment of urban and rural water supply systems in Ferizaj region

PROJECT DESCRIPTION

The project involves conducting a comprehensive assessment of urban and rural water supply systems to evaluate their technical performance and financial viability.

The main objective is to identify areas for improvement in the existing infrastructure and develop recommendations for enhancing the water supply systems. This project aims to ensure the delivery of safe and reliable water to meet the needs of the population.

Service Provided by the Team

The data was analyzed to gain insights into the current state of the infrastructure.

Data Collection and Analysis: The team conducted a thorough data collection process, gathering information on various aspects of the water supply systems such as water sources, treatment plants, distribution networks, storage facilities, pumping stations, and metering systems. This data was analyzed to gain insights into the current state of the infrastructure.

Technical Assessment: The team conducted a detailed evaluation of the water supply systems, assessing their condition, efficiency, and capacity. This involved analyzing the infrastructure components, including pipes, pumps, tanks, and treatment units, to identify any physical limitations or deficiencies. Hydraulic modeling and network analysis were performed to assess the system’s hydraulic performance, water loss, pressure management, and overall operational efficiency.