HidroingHidroing
HidroingHidroing
WATER & WASTEWATER

Detailed design of the sewer network for the needs of Klina Municipality

PROJECT DESCRIPTION

The project's primary objective was to desig The primary objective of the project was to develop a comprehensive and efficient water supply network and sewerage network for Klina Municipality, encompassing both urban and rural areas.n an efficient water and sewerage network for the park and propose a suitable solution for wastewater treatment.

The project’s focus was on designing a system that would guarantee the reliable and sustainable delivery of clean drinking water while effectively managing wastewater. To achieve this, the project incorporated the design of necessary infrastructure, including pipelines, pumping stations, treatment facilities, and other essential components. The design process took into account factors such as population needs, geographic considerations, and future growth projections to ensure that the water supply and sewerage systems could meet the present and future demands of the municipality. By successfully completing the project, Klina Municipality now possesses a well-designed and efficient water supply and sewerage network, contributing to the overall improvement of the community’s quality of life and environmental sustainability.

Service Provided by the Team

Several essential steps were included in the project to ensure the successful design and execution of a water supply and sewage network.

These operations included completing a topographical survey to collect precise data about the terrain and features of the project region.

DTM analysis was performed to assess the digital terrain model and understand the landscape’s characteristics better. Through topographic mapping, detailed maps were created to provide a comprehensive overview of the area’s topography. Furthermore, drone topographic surveying was utilized to gather precise and up-to-date information using advanced aerial technology.

Hydraulic analysis was conducted to assess the water flow and pressure within the network, ensuring efficient and reliable distribution. Based on the findings, a water supply network was designed to deliver clean water effectively to the desired locations. Simultaneously, a sewerage network design was created to manage wastewater appropriately and ensure environmental sustainability.

 Environmental considerations were taken into account to minimize any potential impact on the ecosystem. Lastly, cost estimation was carried out to provide an accurate assessment of the financial resources required for the project. By completing these activities, the project successfully delivered a well-designed water supply and sewerage network, meeting the needs of the community and contributing to its overall development.