Consulting services for the construction of a wastewater treatment plant and related infrastructure in the municipality of Ulcinj

OVERVIEW

The construction of the new Wastewater Treatment Plant and associated infrastructure in the Municipality of Ulcinj is a strategic investment in the city’s future, aimed at improving quality of life, protecting the coastal environment, and supporting the sustainable growth of tourism and the local economy. Hidroing-DK is working together with GOPA Tech GmbH, Germany & E3-Consulting,Montenegro, combining international expertise with strong local knowledge to support the development of modern and environmentally sustainable wastewater infrastructure.

The first phase of the wastewater treatment plant will have a capacity of approximately 60,000 population equivalent (PE), with the possibility of future expansion to around 140,000 PE. The project also includes approximately 7 km of sewer pipelines, two new wastewater pumping stations, a marine outfall system, and the supporting infrastructure required for reliable operation. By improving wastewater collection and treatment, the project will help reduce pollution, protect groundwater and coastal waters, and create a healthier and safer environment for residents and visitors.

Beyond infrastructure, the project will make an important contribution to the protection of Ulcinj’s beaches, marine ecosystems, and natural resources, while strengthening the municipality’s position as a sustainable tourism destination. It will support future urban and tourism development, improve public health and municipal services, and create better conditions for public and private investment. Through an integrated approach combining engineering expertise, environmental responsibility, local knowledge and international experience, Hidroing-DK and GOPA Tech GmbH and E3-Consulting (Montenegro)   are contributing to infrastructure that will create lasting value for the people of Ulcinj, strengthen the city’s tourism potential and help safeguard its unique coastal environment for future generations
Our consultancy services include:

• Verification of baseline data and planning assumptions

• Population, tourism and population equivalent analysis

• Definition of the service area and sewerage catchment

• Hydraulic modelling and preparation of the flow scheme

• Preliminary design of the wastewater treatment plant

• Analysis and selection of wastewater treatment technology

• Design of the main sewer network

• Design of the Pristan and Derane pumping stations

• Design of the marine outfall system

• Planning of sludge treatment, disposal and transport

• Assessment of flood protection and stormwater management

• Topographic surveys and manhole measurements

• Geotechnical investigations

• Wastewater sampling and laboratory analysis

• Biotope mapping

• Environmental and Social Impact Assessment

• Preparation of Environmental and Social Management Plans

• Stakeholder engagement and public consultation

• Support for the land expropriation process

• Design of the access road and infrastructure connections

• Planning of electricity, water supply and telecommunications connections

• Technical assistance for the initial operation of the wastewater treatment plant

• Preparation of implementation and tender documentation

PROJECT RECORDs

Duration

2026-2028

Client

Vodacom - Joint Service and Coordination Company for Water and Wastewater Service for the Montenegrin Coast and the Municipality of Cetinje

Country

Montenegro

Financing

EU grant funds (WBIF) through KfW€