Consulting Services for Water Supply and Waste Water Programme Kosovo V, Phase II Region: Pejë

PROJECT DESCRIPTION

To ensure the successful completion of Kosovo V/ Phase II, several steps have been undertaken.

Firstly, any unclear or low-priority measures have been canceled, prioritizing indicators accessibility. The focus has been directed toward rehabilitating the pipe network to address the high water losses in the distribution system and maximize the benefits for the community in terms of improved water distribution. Additionally, hydraulic modeling of the pipe network in Peja has been conducted to design an additional pressure zone and determine the optimal placement and sizing of new reservoirs and pumping stations. Detailed designs and tender documents have been prepared, taking into account the reprogrammed measures proposed by the waterworks. Reporting has been carried out, highlighting the successes, challenges encountered, and the approaches taken to address them. Furthermore, the level of fulfillment of indicators has been documented to evaluate the project’s overall progress.

Service Provided by the Team

The remaining tasks for the completion of the project include the preparation of Design and Tender documents by HDR Peja, following the guidelines outlined in the Fidic Book.

During the construction phase, proper supervision will be conducted to ensure the quality of work and adherence to project specifications. Additionally, measures for leak detection will be implemented by HDR Peja to address any potential issues.

The planned investments encompass the rehabilitation of the main pump station, the construction of a new reservoir, the establishment of premises for technical services, the installation of the Chlorinator Tikvesh, the construction of wash-out chambers, the installation of air valves, and the rehabilitation of pipes and the network in Gacaferr.